PROJECT DETAILS
Apartment in Telavi
Complete Bathroom RenovationTiling (wall & floor tiles)Walls & Ceilings (plastering, painting)

In the bathroom I tiled the walls and floor in marble-effect tiles and fitted a shower area, a vanity unit and a round LED mirror.
In the living room I laid a glossy black marble-effect floor and built a multi-level ceiling with mirrored inserts and lighting.
Duration
26 days
Location
Telavi